A pipeline begins long before installation

How does a pipeline end up on the seabed? The work starts long before installation, with preparing and coating the steel pipes on land. In this four-part series, we follow the stages that prepare an offshore pipeline for its place at sea. First up: preparing the steel and protecting it against corrosion.

Before a pipeline is laid on the seabed, its steel pipes have already been through several stages. They are  cleaned, coated, handled and inspected. On a project involving thousands of pipes, each stage must be carried out consistently.

Preparing the steel

Industrial coating works much like paint: if the surface has not been properly prepared, the protective layer cannot adhere as it should, and long-term pipeline protection will not live up to the demands That is why the process starts with blasting. This removes mill scale, rust and other contaminants and gives the steel the right surface profile for coating. Eventually followed by a pickling process.

The coating a pipe receives depends on its intended use and the project requirements, which are determined by a front-end engineering design study for the future pipeline The external coating accordingly protects the steel against corrosion. Offshore pipelines may require additional treatment such as concrete weight coating.

Coating and inspection

For coatings such as 3LPE and FBE, the pipes are heated before the coating is applied. The steel temperature, line speed and cooling process all need to be carefully controlled. Between these stages, the heavy pipes must be handled safely without damaging the coating.

Inspection of every step is part of the procedure , too. Checks before, during and after coating help identify defects and confirm whether pipes meet the required specifications. Selmers builds equipment and complete production lines that bring these processes together, including systems for pipe handling, inspection, collecting and interpreting process data.

Preparation on a large scale

Traditionally oil and gas defined the worldwide energy infrastructure. Increasingly, hydrogen and CO₂ capture are changing the landscape.

A good example of CO₂ storage is Aramis, the Dutch project at the Maasvlakte near the harbour of Rotterdam, which is scheduled to become operational around 2030. A project such as Aramis, shows why timely preparation matters. Its planned offshore CO₂ pipeline will require large numbers of pipes. Long before a pipeline like that reaches the seabed, each pipe must meet the project requirements.

Read the article about Selmers in Het Financieele Dagblad for the broader story of pipelines and the energy transition : Selmers in Het Financieele Dagblad: Pipelines are a lifeline

In the next part, we’ll explain why some offshore pipelines need a concrete weight coating.

Innovate better together!

At Selmers, we specialize in advanced industrial machinery and automation for coating and handling pipes and tubes. With over 50 years of experience, we have grown into a trustworthy supplier of numerous automated solutions. Collaboration is key to creating real magic. Interested in optimizing performance and reducing risks?

Selmers B.V. - SJ_EWORKS_778__0519

Related solutions

Pipe insulation
Pipe insulation
UV tube coating
UV tube coating
External composite
External composite

Related news

Clean, Coat, Cure: how UV LED coating is applied
Keeping production lines healthy: why system health checks matter
Selmers heading to ADIPEC 2026: connecting with the international energy industry